Search

Our generation segment has an installed capacity of approximately 2,000 MW, including the incorporation in 2008 of the LMS-100 of 100 MW in Central Térmica Güemes, representing 7.4% of Argentina’s installed capacity. We are also involved in various expansion projects to increase our installed capacity by 178 MW of Central Térmica Loma de la Lata and 102.5 MW of the Ingentis project (for more information, see the section “Summary of Expansion Projects” in this Annual Report). Our transmission segment co-controls the operation and maintenance of the Argentine high voltage transmission network, which extends over more than 10.3 thousand km of lines owned by Transener and 6.1 thousand km of high voltage lines owned by Transba. Transener transports 95% of all the electricity in Argentina. Finally, our distribution segment is composed of Edenor, the largest distributor of electricity in Argentina, with more than 2.6 million customers and a concession area that covers the northern region of the City of Buenos Aires and the northwestern region of Greater Buenos Aires.